Short-term lets

Scotland short-term let licence renewal by council: fees, documents and deadlines

Scottish councils set their own renewal fees and forms. This guide sets out what eight councils with the most licence applications say on their own pages, with the date we read each page, and says plainly where a council publishes nothing.

Contents

Status at 28 October 2026: read from each council’s own pages

These are the councils with the most valid applications to 31 December 2025 (Scottish Government statistics): Highland, Edinburgh, Argyll and Bute, Fife, Perth and Kinross, Dumfries and Galloway, Aberdeenshire and Scottish Borders. Councils change fees (many on 1 April) and forms. Open your own council’s page before you apply. Fife’s website blocked our automated check, so no Fife fee figures are printed.

The short version

  • There is no national renewal fee or checklist. Each council sets its own. In the councils read, the renewal fee was the same as the new-application fee, except Edinburgh and Aberdeenshire, which publish different renewal figures.
  • Only Edinburgh publishes an earliest date to lodge (six months before expiry). Argyll and Bute recommends about two months before; Dumfries and Galloway sends a reminder three months before; Aberdeenshire says it will contact you and asks you to wait for that.
  • The last day to lodge is before the licence expires. Aberdeenshire says the day before.
  • Councils differ on a late renewal. The 1982 Act lets a council treat a renewal made up to 28 days late as in time if good cause is shown. Edinburgh, Argyll and Bute (policy) and Dumfries and Galloway (policy) mention it. Highland, Perth and Kinross, Fife, Aberdeenshire and Scottish Borders publish no such route.
  • Where a council publishes nothing, this guide says Not published. It does not copy another council’s rule.

This guide is general information, not legal advice, and covers Scotland only.

A woman smooths the cover on a double bed in a high-ceilinged flat, towels and a basket in the foreground.
Illustration. AI-generated image. About our images

When to lodge and what each council says about a late renewal

When to lodge, the renewal term and what each council says about a late renewal (read 28 October 2026)
CouncilEarliest to lodgeLast day to lodgeIf you are late (published)
HighlandNot published. The council gives no earliest date.Before the expiry date on the licence. The council says checking the expiry date is the licence holder’s responsibility.Council says it is unlawful to carry on letting after the expiry date if you have not applied to renew. It publishes no late-application route and does not say what fee then applies.
EdinburghSix months before the licence expires.Before the licence expires. The council says you cannot apply to renew after it has expired.A late application up to 28 days after expiry is considered only if the council accepts good cause shown in writing; the decision is final with no appeal. Otherwise the property is unlicensed.
Argyll and ButeNot published. The council recommends applying about 2 months before expiry.Before the existing licence expires.Policy 8.5: an application after expiry is treated as an initial licence and you are unlicensed until it is issued. The council may, on good cause shown, treat an application up to 28 days after expiry as a renewal. The web page does not say this.
FifeNot published in the sheet we could read. It recommends applying as soon as reasonably possible before expiry.Before the previous licence expires.If the licence lapses before you apply, the application is treated as a new application and you must stop taking bookings. If you applied in time, you may keep letting until the renewal is decided. Source: Fife renewal sheet, dated 1 August 2025.
Perth and KinrossNot published. The council may send reminder notices (policy 8.12).Before the expiry date. The council says it ultimately is the licence holder’s responsibility.Policy 8.12: if the expiry date passes first, the application is treated as a new application. Policy 3.3: no one may take bookings or have guests stay until a licence is granted.
Dumfries and GallowayNot published. The council sends a reminder 3 months before expiry.By the expiry date. A council news item says renewals are due three years from the date the original licence came into effect.Policy section 11: a renewal made before expiry, or on cause shown up to 28 days after, keeps the existing licence in effect until a decision is made. The council does not say what happens later than that.
AberdeenshireNot published as a period. The council says it will contact you before expiry to say it is time to apply, and asks you to wait for that before applying.The day before the licence expires. The online system will not accept a renewal on or after the expiry date.The council says you lose existing-host status, must apply as a new host and pay the higher application fee. A host who applied before expiry may keep operating while the renewal is decided.
Scottish BordersNot published.Before the existing licence expires (the page says renewals must be timeously made and prior to the expiry date).The renewals page says only that failure to renew in time will have ramifications for your business operation. It does not say what they are. Policy statement 8.2: a renewal made in time keeps the existing licence in effect until it is decided.

Documents, site notice and planning at renewal

The Scottish Government guidance says you must display a 21-day site notice again when you renew, and the certificate of compliance follows. The mandatory conditions in Schedule 3 to the 2022 Order apply to every council: annual gas safety inspection, an electrical inspection at least every five years, a legionella risk assessment, fire and carbon monoxide detection, buildings and public liability insurance. What a council asks you to upload at renewal differs.

Documents, site notice and planning at renewal, by council
CouncilGas, EICR and PATOther documents and insuranceSite notice at renewalNot published
HighlandGas: Annual (Gas Safe engineer, if gas). EICR: Within the last 5 years where guests can use electrical fittings. PAT: Declaration that PAT is done; no upload listed; no age given.EPC: declaration if one is required. Legionella: do it yourself or with the council template; no upload stated. Fire risk assessment: complete it, do not submit it. Buildings and public liability: declaration; no minimum level published.Yes. The policy says every applicant, including for renewal, displays a notice for 21 days and sends a compliance certificate afterwards using the council template.Not stated whether the Documents you need list must be uploaded again at renewal.
EdinburghGas: Annual certificate, uploaded. EICR: Within the last 5 years, uploaded (not needed where guests have no electrical fittings). PAT: Current PAT certificate, uploaded; no period given.Floor plan and fire safety checklist uploaded at renewal. Legionella, public and buildings insurance, EPC and emergency lighting (secondary letting, 5 or more occupants) are tick-box declarations on the self-declaration form. The policy (4.4) also says you must hold a current fire risk assessment; the form has no tick for it. Insurance levels not published.Yes. 21 consecutive days from the day you lodge, then return the compliance notice to licensing (post or email). If you do not, the council may make you display it again for 21 days.No renewal-only planning rule published. Insurance levels, and age limits for PAT, legionella and EPC, not published.
Argyll and ButeGas: Annual, dated within the last 12 months, uploaded. EICR: Within the last 5 years, uploaded. PAT: PAT report uploaded; appliances date-labelled and signed; no age given.Also uploaded: floor and site plans, SFRS fire safety checklist, public liability and buildings insurance certificates, legionella risk assessment. EPC valid within 10 years if required (tick-box). Insurance level not published.Yes. The council’s notice template has a Renewal tick box. Display for 21 days, then return the certificate of compliance.Whether the pre-application checklist documents all apply again at renewal (the checklist does not say), including unchanged plans; earliest date to lodge.
FifeGas: Current annual certificate, attached. EICR: Current EICR, attached; age not stated in the sheet. PAT: PAT report attached; age not stated.EPC, buildings insurance, public liability insurance and legionella assessment: give the expiry date only; no upload. No minimum insurance level found.Yes. Public notice for 21 days. The renewal sheet (dated 1 August 2025) asks for the certificate of compliance when the notice period ends and within 7 days of it ending.Everything on fife.gov.uk itself (fees, policy, planning).
Perth and KinrossGas: Within the last 12 months. EICR: Within the last 5 years; the checklist adds requirements for the report’s contents. PAT: At least every 12 months, or as the previous PAT report specifies.EPC valid within 10 years where a dwellinghouse is let. Public liability at least 5 million pounds (other liability cover not accepted); buildings insurance valid for the licence. Legionella: give the date last completed.Yes. The guidance says you notify neighbours again when you renew: notice for 21 days at the property, then a certificate of compliance; time-stamped photos suggested.Whether certificates are uploaded or only declared at renewal; legionella and fire age limits.
Dumfries and GallowayGas: Not published for renewal. The Order requires an annual inspection. EICR: Not published for renewal. The Order requires one at least every 5 years. PAT: Not published for renewal.Only a floor plan is named (page says required with every application). No renewal checklist for gas, EICR, EPC, legionella or insurance level.Policy 7.2 covers all applicants and does not name renewals. The Act requires the notice for every renewal (Schedule 1, paragraph 2(2)), whatever the council’s page says.Almost everything is not on its web pages or policy: ask the council which documents it wants at renewal. Its online form was not read (sign-in).
AberdeenshireGas: Within 12 months, uploaded. EICR: Within 5 years, uploaded. PAT: Within 12 months, uploaded.EPC uploaded (secondary lets only). SFRS fire safety checklist uploaded. Public or property owners liability of at least 2 million pounds and buildings insurance evidence uploaded. Private water test results from the last 12 months where applicable. Fire risk assessment and legionella assessment: keep on the premises, not submitted.Yes. 21-day public notice and a certificate of compliance.The online renewal form needs a myAberdeenshire sign-in and was not read.
Scottish BordersGas: Annual inspection (conditions page); upload where applicable; no age given. EICR: At least every 5 years; uploaded. PAT: Uploaded; no age given.Public liability at least 5 million pounds and buildings insurance uploaded. Floor and site plans uploaded. Legionella risk assessment and SFRS fire safety checklist listed. Private water results and EPC where applicable.The FAQ gives the 21-day notice for applications and does not say specifically for renewals. The Act requires it for every renewal (Schedule 1, paragraph 2(2)). Do not return the certificate before the 21 days end. Photograph the notice.Age limits for gas, PAT and EPC uploads; whether the notice applies to renewals. The online form needs a sign-in and was not read.

Renewal fees by council

Fees are in pounds, copied from each council’s own fee page or schedule. A fee here is what the council published, not a quote.

Highland

Bands are guest capacity, not counting children under 2. Same figure for a new application and a renewal. Fee page last modified 14 August 2025; the policy statement (amended 24 February 2026) shows the same figures. No fee date or future change published. Source: Highland fee page and policy statement.

Highland renewal fees in pounds
Licence typeGuests or bandRenewal fee
Home sharing or home letting1 to 2 occupants320
Home sharing or home letting3 to 6 occupants390
Home sharing or home letting7 to 9 occupants460
Home sharing or home letting10 or more530
Secondary letting1 to 2 occupants400
Secondary letting3 to 6 occupants470
Secondary letting7 to 9 occupants540
Secondary letting10 or more610

Edinburgh

Fee schedule headed Valid - 2026/27. Bands are maximum occupancy, not counting children under 10. Secondary letting renewal can be for 1 year or 3 years.

Edinburgh renewal fees in pounds
Licence typeGuests or bandRenewal fee
Secondary letting, 1 yearMax occupancy 1 to 3653
Secondary letting, 1 year4 to 51,089
Secondary letting, 1 year6 to 102,481
Secondary letting, 1 year11 to 153,872
Secondary letting, 1 year16 to 205,264
Secondary letting, 1 year21 or more5,869
Secondary letting, 3 yearsMax occupancy 1 to 31,053
Secondary letting, 3 years4 to 51,489
Secondary letting, 3 years6 to 102,881
Secondary letting, 3 years11 to 154,272
Secondary letting, 3 years16 to 205,664
Secondary letting, 3 years21 or more6,869
Home letting, and home letting and home sharing (3-year renewal)Per occupant360 per occupant
Home sharing (3-year renewal)Flat fee120
Property with a current HMO licencen/a120

Argyll and Bute

Fees and charges schedule 2026-27; renewal fee is the same as the new fee. 3-year licence. Bands are guest capacity, counting children under 10. The 2026-27 figures are 6% higher than 2025-26.

Argyll and Bute renewal fees in pounds
Licence typeGuests or bandRenewal fee
Home sharing or home lettingUp to 4 guests285.30
Secondary lettingUp to 4 guests398.95
Home sharing or home letting5 to 8 guests398.95
Secondary letting5 to 8 guests570.60
Home sharing or home letting9 to 12 guests627.40
Secondary letting9 to 12 guests855.95
Home sharing or home letting13 to 20 guests799.15
Secondary letting13 to 20 guests1,141.30
Home sharing or home letting21 or more1,027.65
Secondary letting21 or more1,426.60

Fife

Not shown. Fife’s fee schedule (April 2026) is on fife.gov.uk, which blocked our automated check on 28 October 2026. We found fee figures only in search summaries and do not print them. Check the council’s fee page.

Perth and Kinross

One New/Renewal fee per 3-year licence. The scheme of charges is headed effective 1 April 2026 and shows the same figures as the fee schedule created in September 2024.

Perth and Kinross renewal fees in pounds
Licence typeGuests or bandRenewal fee
Secondary letting1 to 2 guests350
Secondary letting3 to 6 guests530
Secondary letting7 to 10 guests900
Secondary letting11 or more1,600
Home letting, home sharing, home letting and home sharing1 to 2 guests175
Home letting, home sharing, home letting and home sharing3 to 6 guests265
Home letting, home sharing, home letting and home sharing7 to 10 guests450
Home letting, home sharing, home letting and home sharing11 or more800

Dumfries and Galloway

The page says renewal fee rates are the same as new. 3 years. No effective date is printed on the main fee table.

Dumfries and Galloway renewal fees in pounds
Licence typeGuests or bandRenewal fee
Home sharing or home lettingUp to 6 guests324
Home sharing or home letting7 to 12 guests361
Home sharing or home letting13 or more413
Secondary lettingUp to 6 guests357
Secondary letting7 to 12 guests397
Secondary letting13 or more454

Aberdeenshire

Page says the current fees apply until 31 March 2027. The new-host fee is higher: see the What If I Miss It sheet.

Aberdeenshire renewal fees in pounds
Licence typeGuests or bandRenewal fee
Home sharing or home letting1 to 2 guests331.75
Home sharing or home letting3 to 4 guests433.50
Home sharing or home letting5 to 9 guests545.75
Home sharing or home letting10 to 15 guests652.75
Home sharing or home letting16 or more824
Secondary letting1 to 2 guests433.50
Secondary letting3 to 4 guests578
Secondary letting5 to 9 guests738.50
Secondary letting10 to 15 guests824
Secondary letting16 or more920.25

Scottish Borders

One New and renewal table by guest capacity; the page does not split by licence type and prints no date. 3 years.

Scottish Borders renewal fees in pounds
Licence typeGuests or bandRenewal fee
All licence types1 to 3 guests417
All licence types4 to 6 guests465
All licence types7 or more537

What if you miss it

If you lodge before the licence expires, the existing licence continues until the council decides (Civic Government (Scotland) Act 1982, Schedule 1, paragraph 8(5)). If it expires first, the Scottish Government guidance says a later application is handled as a new application. A council may treat a renewal made up to 28 days late as in time on good cause shown (paragraph 8(5A)), but that is its choice. Our pack has a day-by-day sheet and two email templates for this.

Frequently asked questions

Is the renewal fee the same as the new fee?

At Highland, Argyll and Bute, Perth and Kinross, Dumfries and Galloway and Scottish Borders the page we read gives one figure for new and renewal. Aberdeenshire’s renewal fee is lower than its new-host fee and Edinburgh lists separate renewal figures. We did not read Fife’s fee table.

Can I apply to renew early?

Only Edinburgh publishes an earliest date: six months before expiry. Elsewhere it is not published. Ask the council, using the template in our pack, or follow its recommendation (Argyll and Bute: about two months before).

Do I need the site notice again at renewal?

Yes. The Act requires the notice for every renewal (Schedule 1, paragraph 2(2)) and the Scottish Government guidance says to display a site notice for 21 days again when you apply to renew (4.5 and 6.32). Highland, Edinburgh, Argyll and Bute, Perth and Kinross, Aberdeenshire and Fife say so for renewals. The Dumfries and Galloway and Scottish Borders pages do not mention renewals specifically.

Do I need planning permission to renew?

It depends on whether your property is in a short-term let control area and whether permission is needed. The whole of Edinburgh and Badenoch and Strathspey in Highland are control areas now. Highland has proposed two more (Inverness City and Highland Rural) and sent them to Scottish Ministers, Argyll and Bute is consulting on four, and Perth and Kinross has agreed to ask Ministers to approve one: check the council. The Scottish Government guidance for councils says refusing to consider an application on planning grounds should not be used at renewal, but a council may refuse a renewal on planning grounds if it has good reason.

Sources

Last checked 28 October 2026.

Law and guidance:

Changes to this guide

  • 28 October 2026: Published as a draft for review.

This guide is general information written from the official sources listed above and checked on 28 October 2026. It is not legal, tax or financial advice, and Plainfiles is not endorsed by any government body. Rules change, so check the linked official pages for your own situation. Written and designed by Plainfiles with the help of artificial intelligence (AI) tools, then checked against the official legislation and guidance listed in the sources. How we write and check our guides.